Logo

Amida Resources, Inc.

Yorba Linda, CA 92886

Company Info

  • Est. 1938
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Amida Resources is the combined result of over 68 years of construction experience. Originally founded as Roteman Electric Company by Sam and Jack Roteman in 1938. Larry and Gary Roteman (sons of Sam and Jack) joined after graduating and the company grew to be one of the largest electrical contractors in Los Angeles and Orange County. Retiring in the early 1970’s Jack left the company and Larry Roteman stepped in as President.

In 1981, Jerry Roteman left the company and formed Roteman Building, a general and electrical contracting firm specializing in custom homes and commercial/ professional suites. 

Both companies grew and in 1992, Jerry sold Roteman Building and accepted a position as an Industrial Engineer, in charge of all construction and facilities for a major manufacturer of industrial plastic containers in Canada and the US. 

In 1996 Larry Roteman announced his intent to retire and began a search for a buyer for Roteman Electric Company, Larry eventually sold the company to Jerry Roteman in 1997. In January 2001, Roteman Construction was established and consolidated with Roteman Electric along with our design and engineering business to be called Amida Resources Inc.

Our mission and goal is to produce a high quality product, satisfy all of our customers needs and build and maintain long term relationships with everyone we provide service to. 

What We Do

Commercial Experience

Misc Project Office Building Restaurant
House Mixed Use Non-Building Construction Non-Residential Building Residential Building Single Family Residential

Regions & Counties Serviced

  • Orange, Riverside and San Bernardino Counties

Arizona All

California 2

  • Los Angeles
  • Orange

Our CSI Codes

01 33 16 - Design Data
01 33 29 - Sustainable Design Reporting
01 45 26 - Plant Inspection Procedures
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 78 53 - Sustainable Design Closeout Documentation
01 80 00.00.01 - Performance Requirements
01 81 13 - Sustainable Design Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 87 16 - Furnishings Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 90 00.00.01 - Life Cycle Activities
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 08 00.00.01 - Commissioning of Metals
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 08 00.00.01 - Commissioning of Specialties
11 08 00.00.01 - Commissioning of Equipment
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 08 00.00.01 - Commissioning of Fire Suppression
22 08 00.00.01 - Commissioning of Plumbing
23 08 00.00.01 - Commissioning of HVAC
25 08 00.00.01 - Commissioning of Integrated Automation
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00.00.01 - Commissioning of Electrical Systems
27 08 00.00.01 - Commissioning of Communications
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
32 08 00.00.01 - Commissioning of Exterior Improvements
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
35 41 16 - Levee Cutoff Trenches
40 80 00.00.01 - Commissioning of Process Systems
41 08 30 - Commissioning of Manufacturing Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 08 40 - Commissioning Water Treatment Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 08 00.00.01 - Commissioning of Electrical Power Generation

Project Experience

  • Private
  • New Projects
  • Interior Fit-Ups

Gallery

Featured Image 1
Schiors
Featured Image 2
Starbucks
Featured Image 3
J&K Manufacturing Inc.
Featured Image 4
Services
Share URL copied!
https://www.thebluebook.com/iProView/1550017/amida-resources-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.