Phase 2 Medical

Project Location:
Rochester, NH
Approx Contract:
$450,000

Scope Of Work

Designed to be installed in an existing, unconditioned warehouse that had structural limitations.

New mechanical systems designed to provide ISO conditions at 68° +/- 2° and 50% RH +/- 10%.

Existing walls were matched with insulated urethane metal panels and a 2’’ Gordon grid.

The re-circulation was provided by Envirco MAC 10 fan filter units and cooling through Camfil Slimline Terminal HEPA units.

Use for plastic injection molding.