Featured Project

L-3 / Chrysler Technologies Paint Hangar

Project Location:
Waco, TX

Scope Of Work

HWH refinished the facility for the C-5A, the largest cargo aircraft in U.S. Air Force fleet. The team constructed a prefabricated rigid frame steel system with eight, 75-foot high powered doors. The project, located in Waco, Texas, was completed in 15 months at a cost 30-40 percent below the industry average.

Project Images

#
#
#
#