Logo

Tastad Construction, Inc.

Share

Snohomish, WA 98290

Company Info

  • Est. 2003
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Tastad Construction, Inc. was established in 2003.

Our office is in Snohomish, Washington and we perform most our work in Snohomish, King and Skagit County. 

Our Trades: Underground Utilities, Excavating, and Site Development.

We are Level U certified for Fire Protection Sprinkler Systems.

 

Our Mission 

Tastad Construction, Inc. is committed to building long-term relationships based on integrity,  performance and value, as well as client satisfaction.  We continue to meet the changing needs of our clients with our quality services delivered by the most qualified people.

Our Values

Team Work
We recognize our primary asset is our people.  To be successful, Tastad Construction Inc. must be a rewarding place to work.  We provide opportunity and encouragement to help our staff reach their potential.  We work with our clients as a team. Mutual respect provides the foundation for our success.

Integrity
We remain true to our founding values of quality, honesty and hard work.Tastad is a business based on trust.  We are consistently associated with high standards of service, quality and personal attention to our client’s expectations.

Commitment
We are proactive in finding solutions for our clients that best achieve their goals.  Lasting relationships are the lifeblood of our business.  We want the client to feel that our staff is even more committed to the effort than their own staff.  That’s what distinguishes us.  We commit personal attention to our clients as individuals and genuinely care about them as friends.

 

What We Do

Regions & Counties Serviced

  • Seattle

Washington 3

  • King
  • Skagit
  • Snohomish

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 94 13 - Facility Decommissioning Procedures
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 58 16 - Snow Avalanche Control
02 60 00.00.01 - Contaminated Site Material Removal
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 25 13 - Erosion Controls
31 25 53 - Sedimentation Controls
31 30 00.00.01 - Earthwork Methods
31 41 33 - Trench Shielding
31 53 13 - Timber Cribwork
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 06 30.13 - Retaining Wall Schedule
32 10 00.00.01 - Bases, Ballasts, and Paving
32 11 13 - Subgrade Modifications
32 11 16 - Subbase Courses
32 11 16.16 - Aggregate Subbase Courses
32 11 23 - Aggregate Base Courses
32 11 23.23 - Base Course Drainage Layers
32 11 26.16 - Road Mix Asphaltic Base Courses
32 15 40 - Crushed Stone Surfacing
32 30 00.00.01 - Site Improvements
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 05 13 - Manholes and Structures
33 05 13.13 - Manhole Grade Adjustment
33 05 16 - Utility Structures
33 05 16.13 - Precast Concrete Utility Structures
33 05 16.53 - Rebuilding Utility Structures
33 05 23.16 - Utility Pipe Jacking
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 10 00.00.01 - Water Utilities
33 11 13 - Public Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 11 19 - Fire Suppression Utility Water Distribution Piping
33 16 16 - Underground Water Utility Storage Tanks
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 31 16 - Industrial Waste Utility Sewerage Piping
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 39 13 - Sanitary Utility Sewerage Manholes, Frames, and Covers
33 39 23 - Sanitary Utility Sewerage Cleanouts
33 40 00.00.01 - Storm Drainage Utilities
33 41 13 - Public Storm Utility Drainage Piping
33 42 13 - Pipe Culverts
33 42 13.13 - Public Pipe Culverts
33 42 16 - Concrete Culverts
33 42 16.13 - Precast Concrete Culverts
33 42 16.16 - Cast-in-Place Concrete Culverts
33 44 13 - Utility Area Drains
33 44 13.13 - Catchbasins
33 44 16 - Utility Trench Drains
33 44 19 - Utility Storm Water Treatment
33 44 19.13 - In-Line Utility Storm Water Filters
33 44 19.16 - Catch Basin Insert Utility Storm Water Filters
33 44 19.19 - Utility Oil and Gas Separators
33 45 00.00.01 - Storm Utility Drainage Pumps
33 46 13 - Foundation Drainage
33 46 16 - Subdrainage Piping
33 46 16.13 - Subdrainage Piping
33 46 23.16 - Gravel Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 49 13 - Storm Drainage Manholes, Frames, and Covers
33 49 23 - Storm Drainage Water Retention Structures
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
35 31 16.16 - Segmental Seawalls
35 41 16 - Levee Cutoff Trenches
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping
41 61 13 - Backhoes
41 61 16 - Bulldozers
41 61 19 - Compactors
41 61 23 - Excavators
41 61 26 - Graders
41 62 16 - Dump Trucks

Project Experience

  • Service Work/Repairs

Gallery

Featured Image 1
Pagliacci Pizza
Featured Image 2
Securite Gun Club
Featured Image 3
Freemont Marketime
Featured Image 4
Zeek's Pizza - Lynnwood
Service Area and Locations Map for Tastad Construction, Inc.

Associations & Memberships

BBB (Better Business Bureau) A+ Rating
BBB (Better Business Bureau) A+ Rating
Share URL copied!
https://www.thebluebook.com/iProView/1377386/tastad-construction-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.