Logo

AMEX, Inc. Industrial Services

East Boston, MA 02128

Company Info

  • Size 1-4 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

What We Do

Commercial Experience

Industrial Maintenance Manufacturing Plant Marine Misc Project Sewage / Water Treatment Plant Storage Facility / Warehouse

Regions & Counties Serviced

  • New England

Our CSI Codes

02 01 65 - Maintenance of Underground Storage Tank Removal
02 06 65 - Schedules for Underground Storage Tank Removal
02 51 29.13 - High-Pressure Water Cleaning Decontamination
02 51 33 - Surface Removal Decontamination
02 51 33.13 - Surface Removal Decontamination by Grinding
02 51 33.16 - Surface Removal Decontamination by Sand Blasting
02 51 33.19 - Surface Removal Decontamination by Ultrasound
06 05 83 - Shop-Applied Wood Coatings
06 13 33 - Heavy Timber Pier Construction
09 01 90 - Maintenance of Painting and Coating
09 01 90.51 - Paint Cleaning
09 01 90.52 - Maintenance Repainting
09 01 90.53 - Maintenance Coatings
09 01 90.61 - Repainting
09 01 90.91 - Paint Restoration
09 01 90.92 - Coating Restoration
09 01 90.93 - Paint Preservation
09 06 90 - Schedules for Painting and Coating
09 06 90.13 - Paint Schedule
09 91 13 - Exterior Painting
09 91 23 - Interior Painting
09 93 13.13 - Exterior Staining
09 93 13.53 - Exterior Finishing
09 93 23 - Interior Staining and Finishing
09 93 23.13 - Interior Staining
09 93 23.53 - Interior Finishing
09 94 16 - Faux Finishing
09 94 19 - Multicolor Interior Finishing
09 96 13 - Abrasion-Resistant Coatings
09 96 23 - Graffiti-Resistant Coatings
09 96 26 - Marine Coatings
09 96 59 - High-Build Glazed Coatings
09 96 63 - Textured Plastic Coatings
09 96 66 - Aggregate Wall Coatings
09 97 13 - Steel Coatings
09 97 13.13 - Interior Steel Coatings
09 97 13.23 - Exterior Steel Coatings
12 11 33 - Trompe l'oeil
26 42 13 - Passive Cathodic Protection for Underground and Submerged Piping
26 42 16 - Passive Cathodic Protection for Underground Storage Tank
31 63 19.13 - Rock Sockets for Piles
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
33 01 30.61 - Sewer and Pipe Joint Sealing
33 01 30.62 - Manhole Grout Sealing
33 01 30.72 - Relining Sewers
33 01 50 - Operation and Maintenance of Fuel Distribution Lines
33 01 50.51 - Cleaning Fuel-Storage Tanks
33 01 50.71 - Lining of Steel Fuel-Storage Tanks
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 05 30 - Common Work Results for Coastal Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 43 37 - Riprap Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders
40 46 16 - Coatings and Wrappings for Process Corrosion Protection
40 46 42 - Cathodic Process Corrosion Protection
41 36 23.16 - High-Pressure Water Cutting Equipment

Associations & Memberships

NACE (National Assn. of Corrosion Engineers)
NACE (National Assn. of Corrosion Engineers)
Share URL copied!
https://www.thebluebook.com/iProView/1367881/amex-inc-industrial-services/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.