Featured Project Return to Projects List
Schmidland Bridge
Project Information
- Project Location:
- Vernonia, OR
- Approx Contract:
- $10,000
- Status:
- Completed - Aug 2014
- Structure Type:
- Bridge
References
- General Contractor:
- Green Earth Heavy Hauling
Scope Of Work
Removed large culvert, replaced with I beam bridge to bring the stream back to original flow, stream restoration, stabilized bank with rip rap.