Logo

Lesco Construction LLC

Lewisville, TX 75056

Company Info

  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Our main lines of business include: Excavating Contractors, Soil Erosion Control.

Lesco Construction LLC has been listed in the Blue Book since 2015.

What We Do

Commercial Experience

Airport Runway Animal Hospital / Kennel Apartments & Condominiums Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Casinos Church / Synagogue City / Town Hall Civil & Site Development Club House / Community Center Court House Dams & Levies Data Centers - Mission Critical Design Build Education (K-12) Fire / Police Station Fitness Center Gas Station Golf Course Government Grocery Stores Historic Preservation Hospital / Nursing Home Hotel / Motel House Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Military Misc Project Mixed Use Museum Non-Building Construction Non-Residential Building Office Building Park / Playground Parking Garage Parking Lots Post Office Pre-Manufactured Structures Radio / Television Station Renewable Energy Residential Building Restaurant Retail Store Road / Highway School / College / University Secure and Shielded Facilities Sewage / Water Treatment Plant Single Family Residential Storage Facility / Warehouse Tennis Court Terminal - Airport / Bus / Railroad Theater Theme Park Tract Housing

Regions & Counties Serviced

  • Dallas, Fort Worth

Texas All

Our CSI Codes

01 57 13 - Temporary Erosion and Sediment Control
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 58 13 - Snow Fencing
02 58 16 - Snow Avalanche Control
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 06 20.16 - Backfill Material Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 23 - Fill
31 23 23.13 - Backfill
31 23 23.23 - Compaction
31 23 23.33 - Flowable Fill
31 23 23.43 - Geofoam
31 23 33 - Trenching and Backfilling
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 30 00.00.01 - Earthwork Methods
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
31 72 13 - Rock Reinforcement and Initial Support
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 11 33 - Cement-Treated Base Courses
32 30 00.00.01 - Site Improvements
32 32 34 - Reinforced Soil Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.23 - Structural Soil Mixing
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
32 92 13 - Hydro-Mulching
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
34 82 19 - Bridge Pier Protection
35 31 29.40 - Stone Groins
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 41 16 - Levee Cutoff Trenches
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 42 35 - Slope Protection Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
35 43 35 - Slope Protection Scour Protection
35 73 13 - Earth Embankment Dam

Project Experience

  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Projects From $10,000 to $500,000

Gallery

Featured Image 1
Excavating & Grading ~ Site Development ~ Soil Erosion Control ~ Soil Stabilization
Share URL copied!
https://www.thebluebook.com/iProView/1345893/lesco-construction-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.