Logo

RoviSys Building Technologies

Aurora, OH 44202

Company Info

  • Est. 1989
  • Size 500+ Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

RoviSys Building Technologies (RBT) provides engineering services for building management and HVAC controls solutions using both industrial and commercial grade technologies, including DCS, PLC and DDC platforms. RBT specializes in high-tech and industrial projects where environmental control is a critical component of the customer’s primary business.

Areas of engineering and technical expertise include:

  • HVAC, chiller and boiler controls
  • Cooling tower management
  • Water-management systems, including wastewater
  • Potable and non-potable water systems
  • Power-quality and energy-management systems
  • CCTV, security access and public address system integration

RBT is a member of the RoviSys family of companies that formed in April 1989 to provide independent control-system integration for customers seeking the capabilities and freedom not offered by proprietary control systems. RBT’s philosophy of technology independence allows it to focus on each customer’s specific needs and satisfaction. The resulting RoviSys brand has grown to more than 250 engineers at four locations: Aurora, Ohio; Apex, N.C.; Boston; and Singapore.

RBT brings over 30 years of process control heritage to industrial building-management and central-utility controls. Whether specifying plant-floor instrumentation, configuring control strategies or commissioning a new system, RBT’s engineers are trained and encouraged to view each project through the requirements, regulations and priorities of the end customer.

What We Do

Commercial Experience

Data Centers - Mission Critical Misc Project
Animal Hospital / Kennel Apartments & Condominiums Arena / Stadium Assisted Living Athletic Field Casinos Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Education (K-12) Fire / Police Station Fitness Center Government Grocery Stores Hospital / Nursing Home Hotel / Motel Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Medical Office Mixed Use Museum Non-Residential Building Office Building Parking Garage Post Office Power Generation & Distribution Pre-Manufactured Structures Radio / Television Station Renewable Energy School / College / University Secure and Shielded Facilities Sewage / Water Treatment Plant Terminal - Airport / Bus / Railroad Theater Theme Park Utilities

Regions & Counties Serviced

  • Cleveland - Northeastern Ohio

Alabama All

Alaska All

Arizona All

Arkansas All

California All

Colorado All

Connecticut All

Delaware All

District Of Columbia All

Florida All

Georgia All

Hawaii All

Idaho All

Illinois All

Indiana All

Iowa All

Kansas All

Kentucky All

Louisiana All

Maine All

Maryland All

Massachusetts All

Michigan All

Minnesota All

Mississippi All

Missouri All

Montana All

Nebraska All

Nevada All

New Hampshire All

New Jersey All

New Mexico All

New York All

North Carolina All

North Dakota All

Ohio All

Oklahoma All

Oregon All

Pennsylvania All

Puerto Rico All

Rhode Island All

South Carolina All

South Dakota All

Tennessee All

Texas All

Utah All

Vermont All

Virginia All

Washington All

West Virginia All

Wisconsin All

Wyoming All

Our CSI Codes

01 45 26 - Plant Inspection Procedures
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00.00.01 - Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 21 16 - Measured Drawings
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 08 00.00.01 - Commissioning of Metals
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 08 00.00.01 - Commissioning of Specialties
11 08 00.00.01 - Commissioning of Equipment
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
13 50 00.00.01 - Special Instrumentation
21 08 00.00.01 - Commissioning of Fire Suppression
22 08 00.00.01 - Commissioning of Plumbing
23 08 00.00.01 - Commissioning of HVAC
23 09 13 - Instrumentation and Control Devices for HVAC
23 09 13.13 - Actuators and Operators
23 09 13.23 - Sensors and Transmitters
23 09 23 - Direct-Digital Control System for HVAC
23 09 33 - Electric and Electronic Control System for HVAC
23 09 43 - Pneumatic Control System for HVAC
23 09 53 - Pneumatic and Electric Control System for HVAC
23 09 93 - Sequence of Operations for HVAC Controls
25 01 10 - Operation and Maintenance of Integrated Automation Network Equipment
25 01 20 - Operation and Maintenance of Integrated Equipment
25 01 30 - Operation and Maintenance of Integrated Automation Instrumentation and Terminal Devices
25 01 90 - Diagnostic Systems for Integrated Automation
25 05 53 - Identification for Integrated Automation
25 06 11 - Schedules for Integrated Automation Network
25 06 12 - Schedules for Integrated Automation Network Gateways
25 06 13 - Schedules for Integrated Automation Control and Monitoring Network
25 06 14 - Schedules for Integrated Automation Local Control Units
25 06 30 - Schedules for Integrated Automation Instrumentation and Terminal Devices
25 08 00.00.01 - Commissioning of Integrated Automation
25 30 00.00.01 - Integrated Automation Instrumentation and Terminal Devices
25 31 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Facility Equipment
25 35 19 - Integrated Automation Control Valves
25 35 26 - Integrated Automation Compressed Air Supply
25 36 19 - Integrated Automation Current Sensors
25 38 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Electronic Safety and Security Systems
25 50 00.00.01 - Integrated Automation Facility Controls
25 51 00.00.01 - Integrated Automation Control of Facility Equipment
25 55 00.00.01 - Integrated Automation Control of HVAC
25 56 00.00.01 - Integrated Automation Control of Electrical Systems
25 90 00.00.01 - Integrated Automation Control Sequences
25 91 00.00.01 - Integrated Automation Control Sequences for Facility Equipment
25 95 00.00.01 - Integrated Automation Control Sequences for HVAC
25 96 00.00.01 - Integrated Automation Control Sequences for Electrical Systems
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00.00.01 - Commissioning of Electrical Systems
26 09 23 - Lighting Control Devices
26 09 36 - Modular Dimming Controls
26 09 36.13 - Manual Modular Dimming Controls
26 09 36.16 - Integrated Multipreset Modular Dimming Controls
26 09 43 - Network Lighting Controls
26 09 43.13 - Digital-Network Lighting Controls
26 09 43.16 - Addressable Fixture Lighting Control
26 24 19 - Motor-Control Centers
26 27 13 - Electricity Metering
27 08 00.00.01 - Commissioning of Communications
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 08 00.00.01 - Commissioning of Exterior Improvements
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 12 33 - Water Utility Metering
33 51 33 - Natural-Gas Metering
33 61 33 - Hydronic Energy Distribution Metering
33 63 33 - Steam Energy Distribution Metering
33 71 73 - Electrical Utility Services
33 71 73.33 - Electric Meters
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
34 43 26.13 - Airfield Lighting Control Equipment
34 43 26.16 - Airfield Lighting PLC Control Equipment
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 80 00.00.01 - Commissioning of Process Systems
40 90 00.00.01 - Instrumentation and Control for Process Systems
40 92 49 - Variable Frequency Drives
40 94 23 - Distributed Process Control Systems
40 94 43 - Programmable Logic Process Controllers
41 08 30 - Commissioning of Manufacturing Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 08 40 - Commissioning Water Treatment Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 08 00.00.01 - Commissioning of Electrical Power Generation

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Service Work/Repairs
  • LEED Experience

Gallery

Featured Image 1
Engineering Services for Building Automation
Featured Image 2
RoviSys Scope of Services
Featured Image 3
Services
Featured Image 4
Vandalay

Associations & Memberships

ISPE (International Society of Pharmaceutical Engineering)
ISPE (International Society of Pharmaceutical Engineering)
NFPA (National Fire Protection Assn.)
NFPA (National Fire Protection Assn.)
CSIA (Control System Integrators Assn.)
CSIA (Control System Integrators Assn.)
AEE (Assn. of Energy Engineers)
AEE (Assn. of Energy Engineers)
ISA (Instrument Society of America)
ISA (Instrument Society of America)
LEED Green Associate
LEED Green Associate

Preferred Brands

JCI
JCI
Rockwell Automation
Rockwell Automation
Siemens
Siemens
Emerson Process Management
Emerson Process Management
Honeywell
Honeywell
KMC Controls
KMC Controls
Vykon
Vykon
Andover Controls
Andover Controls
Iconics Genesis
Iconics Genesis
Distech Controls
Distech Controls
Cisco Networking Systems
Cisco Networking Systems
Wonderware
Wonderware
GE
GE
OSI
OSI
VT Scada
VT Scada
Schneider Electric
Schneider Electric
Share URL copied!
https://www.thebluebook.com/iProView/1310185/rovisys-building-technologies/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.