Logo

Underground Infrastructure Solutions

Oakland Park, FL 33334

Company Info

  • Est. 1990
  • Size 10-19 Employees
  • Annual Vol Not Provided

Featured Project Return to Projects List

Bulow Plantation – Valve Installation & Isolation Plan

Project Information

Project Location:
Flager Beach, FL
Status:
Completed
Structure Type:
Utilities

References

Owner:
SSI now UIS
Client:
Equity Lifestyle Properties

Scope Of Work

Subsurface will utilize ‘GPR” Ground Penetrating Radar and to locate the mainlines and feeds that crossover and feed the community.

Perform a system analysis and install six 4” Gate Valves at the strategic locations, to isolate the RV community from the manufactured home community.

Install the 6 valves 

Use the radar to locate the appropriate pipes, cut the roots from the trees within the excavation and install the valves.

Upon confirmation of pipe layout and design we will secure excavation and move to strategic locations and excavate all other locations so as mitigate any customer inconvenience and minimize shut off times. Once all valves are installed, valves will be operated in tandem to confirm isolation of the 2 systems. 

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1304138/underground-infrastructure-solutions/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.