Bakersfield WWTP#3

Project Information

Project Location:
Bakersfield, MD
Status:
Completed
Structure Type:
Misc Project

Scope Of Work

Mass. Electric Construction Co. (MEC) worked as a subcontractor to Kiewit Pacific Co. at the Bakersfield Waste Water Treatment Plant (WWTP). The project entailed the construction and upgrade of the WWTP from a 16mgd to 32mgd capacity plant.

 

MEC’s work included the following: 

Installation of a new 12,000-volt service and plant power loop feeder 

system

Installation of a new self-healing fiber-optic SCADA loop incorporating

new and existing facilities

Associated power distribution, lighting, and process controls for: 

A new headworks structure 

 The conversion of four (4) existing secondary clarifiers into primary clarifiers

A new activated sludge secondary treatment system including a new blower building, new aeration basin, and four (4) new secondary clarifiers

A new 2mgd tertiary treatment system (cloth media filtration,  

chemical feed system, and the reclaimed water storage system)

Two (2) new anaerobic sludge digesters & sludge dewatering  

building

A new power cogeneration building

The new administration and operations buildings and plant  

maintenance facility

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1300286/mass-electric-construction-co/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.