Logo

Solid Earth Technologies, Inc.

Amherst, NH 03031

Company Info

  • Est. 1999
  • Size 5-9 Employees
  • Annual Vol $1 million - $3 million

People Also View These
Loading...

Our Story

Helical Pier Contractors of New England

 


Solid Earth Technologies Brochure

Solid Earth Technologies, Inc. located in Amherst, NH, has been installing helical piles for commercial, residential and government projects throughout New England. Being highly qualified helical pier contractors, we have specialized in foundation stabilization and foundation repair for over twelve years.

Our professional team of certified installers are trained to diagnose foundation issues and recommend the best and most economical solution for you. We have the technical skills and resources to complete the most complicated projects. Our management team is educated and experienced in soil mechanics, piling and earth anchor design and installation. Our crew members have satisfied all of the requirements by AB Chance and are certified for helical pile installations.

Solid Earth Technologies, Inc. works with geotechnical and structural engineers to provide solutions to soil and foundation problems for their customers. Our services include:

The specialized AB Chance Helical Pier solutions we use combined with our construction and engineering expertise offers unique advantages to support a variety of applications. To learn more about how we can assist your needs, contact us today!

What We Do

Regions & Counties Serviced

  • New England

Connecticut All

Maine All

Massachusetts All

New Hampshire All

New York All

Rhode Island All

Vermont All

Our CSI Codes

01 57 13 - Temporary Erosion and Sediment Control
01 73 23 - Bracing and Anchoring
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 57 13 - Sinkhole Remediation by Grouting
02 57 13.13 - Sinkhole Remediation by Compaction Grouting
02 57 13.16 - Sinkhole Remediation by Cap Grouting
02 57 16 - Sinkhole Remediation by Backfilling
02 58 13 - Snow Fencing
03 06 30.23 - Concrete Shaft Schedule
03 06 60 - Schedules for Grouting
03 61 13 - Dry-Pack Grouting
03 62 13 - Non-Metallic Non-Shrink Grouting
03 62 16 - Metallic Non-Shrink Grouting
03 64 23 - Epoxy Injection Grouting
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
06 13 33 - Heavy Timber Pier Construction
31 01 40 - Maintenance of Shoring and Underpinning
31 01 60 - Maintenance of Special Foundations and Load Bearing Elements
31 01 62 - Maintenance of Driven Piles
31 01 62.61 - Driven Pile Repairs
31 01 63 - Maintenance of Bored and Augered Piles
31 01 63.61 - Bored and Augered Pile Repairs
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 06 40 - Schedules for Shoring and Underpinning
31 06 50 - Schedules for Excavation Support and Protection
31 06 60 - Schedules for Special Foundations and Load Bearing Elements
31 06 60.13 - Driven Pile Schedule
31 06 60.16 - Caisson Schedule
31 09 16.23 - Driven Pile Load Tests
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 32 23 - Pressure Grouting Soil Stabilization
31 32 23.13 - Cementitious Pressure Grouting Soil Stabilization
31 32 23.16 - Chemical Pressure Grouting Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 32 36 - Soil Nailing
31 32 36.13 - Driven Soil Nailing
31 32 36.16 - Grouted Soil Nailing
31 32 36.19 - Corrosion-Protected Soil Nailing
31 32 36.23 - Jet-Grouted Soil Nailing
31 32 36.26 - Launched Soil Nailing
31 33 13 - Rock Bolting and Grouting
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
31 40 00.00.01 - Shoring and Underpinning
31 43 13 - Pressure Grouting
31 43 13.13 - Concrete Pressure Grouting
31 43 13.16 - Polyurethane Pressure Grouting
31 43 16 - Compaction Grouting
31 45 13 - Vibroflotation
31 45 16 - Densification
31 46 13 - Cantilever Needle Beams
31 48 13 - Underpinning Piers
31 48 19 - Bracket Piers
31 48 33 - Micropile Underpinning
31 51 13 - Excavation Soil Anchors
31 51 16 - Excavation Rock Anchors
31 52 13 - Sheet Piling Cofferdams
31 52 16 - Timber Cofferdams
31 52 19 - Precast Concrete Cofferdams
31 53 13 - Timber Cribwork
31 54 00.00.01 - Ground Freezing
31 56 13 - Bentonite Slurry Walls
31 56 13.13 - Soil-Bentonite Slurry Walls
31 56 13.16 - Cement-Bentonite Slurry Walls
31 56 13.19 - Slag-Cement-Bentonite Slurry Walls
31 56 13.23 - Soil-Cement-Bentonite Slurry Walls
31 56 13.26 - Pozzolan-Bentonite Slurry Walls
31 56 13.29 - Organically-Modified Bentonite Slurry Walls
31 56 16 - Attipulgite Slurry Walls
31 56 16.13 - Soil-Attipulgite Slurry Walls
31 56 19 - Slurry-Geomembrane Composite Slurry Walls
31 56 23 - Lean Concrete Slurry Walls
31 60 00.00.01 - Special Foundations and Load-Bearing Elements
31 62 13.13 - Cast-in-Place Concrete Piles
31 62 13.26 - Pressure-Injected Footings
31 63 16 - Auger Cast Grout Piles
31 63 19.13 - Rock Sockets for Piles
31 63 23 - Bored Concrete Piles
31 63 23.13 - Bored and Belled Concrete Piles
31 63 23.16 - Bored Friction Concrete Piles
31 63 26 - Drilled Caissons
31 63 26.13 - Fixed End Caisson Piles
31 63 26.16 - Concrete Caissons for Marine Construction
31 63 29 - Drilled Concrete Piers and Shafts
31 63 29.13 - Uncased Drilled Concrete Piers
31 64 13 - Box Caissons
31 64 16 - Excavated Caissons
31 64 19 - Floating Caissons
31 64 23 - Open Caissons
31 64 26 - Pneumatic Caissons
31 64 29 - Sheeted Caissons
31 66 16.46 - Slurry Diaphragm Foundation Walls
31 66 16.53 - Soldier-Beam Foundation Walls
31 68 13 - Rock Foundation Anchors
31 72 13 - Rock Reinforcement and Initial Support
31 73 13 - Cement Tunnel Grouting
31 73 16 - Chemical Tunnel Grouting
31 75 13 - Cast-in-Place Concrete Shaft Lining
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 06 30.13 - Retaining Wall Schedule
32 11 33 - Cement-Treated Base Courses
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 34 - Reinforced Soil Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.23 - Structural Soil Mixing
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
32 92 13 - Hydro-Mulching
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
34 82 19 - Bridge Pier Protection
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 05 30 - Common Work Results for Coastal Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.16 - Segmental Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 31 29.40 - Stone Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 42 35 - Slope Protection Bank Protection
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
35 43 35 - Slope Protection Scour Protection
35 43 37 - Riprap Scour Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 53 43 - Underwater Foundation Construction
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders

Project Experience

  • Non-Union
  • Public
  • Private
  • Projects Up to $500,000

Gallery

Featured Image 1
Norwell Bike & Pedestrian Path - Norwell, MA

Preferred Brands

Chance
Chance
Share URL copied!
https://www.thebluebook.com/iProView/12939/solid-earth-technologies-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.