Logo

Andrade Concrete & Construction, Inc.

Houston, TX 77039

Company Info

  • Est. 2014
  • Size 500+ Employees
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Here at Andrade Concrete & Construction, Inc., building is not just a job, but a way of life. From land clearing, site prep, and underground work; to commercial and residential construction, our team of professionals are prepared to provide our expertise and quality workmanship in every project we do for our customers.

Whether you have a small residential project or a "larger than life" commercial project, Andrade Concrete & Construction, Inc. (ACC) prides itself in the knowledge, resources, and ability to see your new construction through from start to finish, and exceed customer service standards that have become the normal in this industry. You will be informed, involved, and considered to ensure that your concept and vision come to life.

What We Do

Commercial Experience

City / Town Hall School / College / University Swimming Pool
Animal Hospital / Kennel Assisted Living Auto Dealership / Service Bank Casinos Church / Synagogue Club House / Community Center Court House Data Centers - Mission Critical Education (K-12) Fire / Police Station Fitness Center Gas Station Grocery Stores Historic Preservation Hospital / Nursing Home Hotel / Motel Laboratory Library Manufacturing Plant Medical Office Mixed Use Museum Office Building Post Office Pre-Manufactured Structures Radio / Television Station Restaurant Retail Store Storage Facility / Warehouse Terminal - Airport / Bus / Railroad Theater Theme Park

Regions & Counties Serviced

  • Houston

Texas All

Our CSI Codes

01 35 16 - Alteration Project Procedures
01 94 13 - Facility Decommissioning Procedures
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
03 01 20 - Maintenance of Concrete Reinforcing
03 01 30 - Maintenance of Cast-in-Place Concrete
03 01 70 - Maintenance of Mass Concrete
03 06 20 - Schedules for Concrete Reinforcing
03 06 20.13 - Concrete Beam Reinforcing Schedule
03 06 20.16 - Concrete Slab Reinforcing Schedule
03 06 30 - Schedules for Cast-in-Place Concrete
03 06 30.13 - Concrete Footing Schedule
03 06 30.16 - Concrete Column Schedule
03 06 30.19 - Concrete Slab Schedule
03 06 30.26 - Concrete Beam Schedule
03 06 70 - Schedules for Mass Concrete
03 11 13.13 - Concrete Slip Forming
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 31 13 - Heavyweight Structural Concrete
03 31 23 - High-Performance Structural Concrete
03 35 23 - Exposed Aggregate Concrete Finishing
03 35 26 - Grooved Concrete Surface Finishing
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
04 22 33 - Interlocking Concrete Unit Masonry
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
07 76 13 - Roof Ballast Pavers
07 76 16 - Roof Decking Pavers
25 05 26 - Grounding and Bonding for Integrated Automation
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 53 13 - Timber Cribwork
32 06 30.13 - Retaining Wall Schedule
32 14 13 - Precast Concrete Unit Paving
32 14 13.13 - Interlocking Precast Concrete Unit Paving
32 14 13.19 - Porous Precast Concrete Unit Paving
32 14 16 - Brick Unit Paving
32 14 23 - Asphalt Unit Paving
32 14 26 - Wood Paving
32 14 40 - Stone Paving
32 14 43 - Porous Unit Paving
32 16 13.13 - Cast-In-Place Concrete Curbs and Gutters
32 16 13.16 - Cast-In-Place Concrete Curbs
32 16 13.19 - Cast-In-Place Concrete Gutters
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
35 01 70 - Operation and Maintenance of Dams
35 05 70 - Common Work Results for Dams
35 06 70 - Schedules for Dams
35 31 16.16 - Segmental Seawalls
35 41 16 - Levee Cutoff Trenches
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
35 49 13 - Floodwalls
35 49 13.13 - Concrete Floodwalls
35 70 00.00.01 - Dam Construction and Equipment
35 71 13 - Concrete Gravity Dams
35 71 16 - Masonry Gravity Dams
35 72 13 - Concrete Arch Dams
35 74 13 - Concrete Buttress Dams
40 95 73 - Process Control Wiring

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private

Diversity

  • Minority Business Enterprise
  • Small Business Enterprise
  • Historically Underutilized Business Zone

Gallery

Featured Image 1
Clearing
Featured Image 2
Pool Excavation
Featured Image 3
Franklin Street Repair
Featured Image 4
Sawcutting f

Associations & Memberships

SBE (Small Business Enterprise)
SBE (Small Business Enterprise)
Share URL copied!
https://www.thebluebook.com/iProView/1261977/andrade-concrete-construction-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.