Logo

R2R Demolition, Inc.

Pompano Beach, FL 33069

Company Info

  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

R2R DEMOLITION INC. IS A THIRD GENERATION COMPANY STEMMING FROM FATHER TO SON. R2R DEMOLITION INC.'S OWNER JOHN DUNCAN JR. IS DEEPLY ROOTED IN THE POMPANO BEACH COMMUNITY AND THE ENTIRE TRI-STATE AREA HAVING WORKED ALONGSIDE HIS FATHER JOHN DUNCAN SR. THE OWNER OF J& S CONSTRUCTION & EQUIPMENT INC. JOHN JR. IN HIS MANY YEARS OF INTERNSHIP HAS COME TO BE KNOWN FOR HIS MANY SKILL SETS RANGING FROM EXCAVATION, DEMOLITION, DRIVEWAY RENEWAL, HAULING, GRADING ,  AND NOW ADDING TO THE LIST GENERA BUILDING, ETC. ALONGSIDE JOHN SR.  JOHN JR. HAS BECOME A WELL KNOWN FACE IN THE CONSTRUCTION INDUSTRY NOT ONLY TO OWNERS WANTING A HOME DEMOLISHED BUT ALSO TO PAVERS, CITY OFFICIALS AND THE BROWARD COUNTY AND MIAMI DADE COUNTY SCHOOL BOARD.

What We Do

Regions & Counties Serviced

  • Florida-South-West Palm Beach, Miami, Naples

Florida 3

  • Broward
  • Miami-dade
  • Palm Beach

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 94 13 - Facility Decommissioning Procedures
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 58 16 - Snow Avalanche Control
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam

Gallery

Featured Image 1
1 STORY SINGLE FAMILY HOME
Featured Image 2
WAWA's POMPANO BEACH Photo 1
Featured Image 3
WAWA SAMPLE AND FEDERAL
Share URL copied!
https://www.thebluebook.com/iProView/1221448/r2r-demolition-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.