Logo

Next Phase Environmental, Inc.

Underwood, IA 51576

Company Info

  • Est. 2004
  • Size 5-9 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Commercial construction contractor specializing in park construction, land clearing, right of way reclamation & specialty erosion control projects.

What We Do

Regions & Counties Serviced

  • Iowa, Omaha, NE

Iowa All

Our CSI Codes

01 57 13 - Temporary Erosion and Sediment Control
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 32 19 - Exploratory Excavations
02 58 13 - Snow Fencing
02 58 16 - Snow Avalanche Control
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 23 13 - Subgrade Preparation
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 30 00.00.01 - Earthwork Methods
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
32 01 30 - Operation and Maintenance of Site Improvements
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 30 - Schedules for Site Improvements
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.19 - Planting Soil Mixing
32 91 13.23 - Structural Soil Mixing
32 91 13.26 - Planting Beds
32 92 13 - Hydro-Mulching
32 92 16 - Plugging
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
34 82 19 - Bridge Pier Protection
35 31 29.40 - Stone Groins
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
35 73 13 - Earth Embankment Dam

Gallery

Featured Image 1
Services
Featured Image 3
Services
Featured Image 4
Services

Associations & Memberships

DOT (Department of Transportation)
DOT (Department of Transportation)

Preferred Brands

John Deere
John Deere
Share URL copied!
https://www.thebluebook.com/iProView/1219763/next-phase-environmental-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.