Logo

Nathanyl Gomes Construction Corp.

New Bedford, MA 02744

Company Info

  • Est. 9
  • Size 10-19 Employees
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Nathanyl Gomes Construction Specializes in :

                                            *Excavation

                                           * Foundation

                                     *Sewer & Water Tie-ins

                                           *Septic Systems

                                            * Demolition

Fully Licensed & Insured in Massachusetts

From concrete cutting to foundation framing, we do it all! Additionally, we work on the following aspects of your property to ensure that your needs are met:

*Driveways
*Retaining Walls
*Concrete & Cement Floors
*Sidewalks
*Concrete Foundations
*Concrete Slabs
*Patios & Garages

What We Do

Commercial Experience

Medical Office Parking Garage Parking Lots

Regions & Counties Serviced

  • New England

Massachusetts 1

  • Bristol

Our CSI Codes

01 94 13 - Facility Decommissioning Procedures
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 51 29.16 - Vacuum Sweeping Cleaning Decontamination
02 54 13 - Aerobic Processes Decontamination
02 54 16 - Anaerobic Processes Decontamination
22 13 53 - Facility Septic Tanks
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
32 01 11 - Paving Cleaning
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.19 - Planting Soil Mixing
32 91 13.26 - Planting Beds
32 92 16 - Plugging
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 36 13 - Utility Septic Tank and Effluent Wet Wells
33 36 16 - Utility Septic Tank Effluent Pumps
33 36 33 - Utility Drainage Field
33 41 13 - Public Storm Utility Drainage Piping
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
35 41 16 - Levee Cutoff Trenches
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Prevailing Wages (Davis Bacon)

Diversity

  • Small Business Enterprise

Gallery

Featured Image 1
Services
Featured Image 2
Services
Featured Image 3
Services
Featured Image 4
Services
Share URL copied!
https://www.thebluebook.com/iProView/1219246/nathanyl-gomes-construction-corp/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.