M & M Construction & Landscaping LLC

Bloomfield, CT 06002

Company Info

  • Est. 2008
  • Size 1-4 Employees
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Our main lines of business include: Sewer Contractors, Underground Utilities--Contractors, Site Development.

M & M Construction & Landscaping LLC has been listed in the Blue Book since 2013.

What We Do

  • Sewer Contractors
  • Site Development
  • Underground Utilities--Contractors

Regions & Counties Serviced

  • Connecticut and Western Mass.

Connecticut 1

  • Hartford

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
22 13 13 - Facility Sanitary Sewers
22 13 16 - Sanitary Waste and Vent Piping
22 13 19 - Sanitary Waste Piping Specialties
22 14 13 - Facility Storm Drainage Piping
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
32 01 30 - Operation and Maintenance of Site Improvements
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 30 - Schedules for Site Improvements
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.19 - Planting Soil Mixing
32 91 13.26 - Planting Beds
32 92 16 - Plugging
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.51 - Maintenance of Sewer Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 05 13.13 - Manhole Grade Adjustment
33 06 10 - Schedules for Water Utilities
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 30 - Instrumentation and Control for Sanitary Sewerage Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping

Gallery

Featured Image 1
Underground Utilities--Contractors
Share URL copied!
https://www.thebluebook.com/iProView/1183698/m-m-construction-landscaping-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.