Logo

Geo-Advantec, Inc.

San Dimas, CA 91773

Company Info

  • Est. 2012
  • Size 50-99 Employees

Featured Project Return to Projects List

Storm Water Disposal at Gary Avenue

Project Information

Project Location:
Pomona, CA
Status:
Completed - Jan 2015
Structure Type:
Misc Project

Scope Of Work

The City intended to design and construct an on-site storm-water disposal system. The system would collect and infiltrate Garey Avenue runoff into the ground. Geo-Advantec scope of work included conducting several exploratory borings at the designated locations, conducting SPT and sampling at 3 feet intervals for the substrata profile determination, collecting disturbed/bulk samples of the encountered subsurface material, conducting three percolation tests at a depth targeting the most permeable layer, performing laboratory testing on the selected soils samples, reviewing the field data and the laboratory test results, performing engineering analyses, and preparing a final geotechnical evaluation report that included results of our field and laboratory testing and determined infiltration rates at the site. Our team completed the project in less than two weeks.

Share URL copied!
https://www.thebluebook.com/iProView/1178223/geo-advantec-inc/vendor-services/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.