Storm Water Disposal at Gary Avenue
Project Information
- Project Location:
- Pomona, CA
- Status:
- Completed - Jan 2015
- Structure Type:
- Misc Project
Scope Of Work
The City intended to design and construct an on-site storm-water disposal system. The system would collect and infiltrate Garey Avenue runoff into the ground. Geo-Advantec scope of work included conducting several exploratory borings at the designated locations, conducting SPT and sampling at 3 feet intervals for the substrata profile determination, collecting disturbed/bulk samples of the encountered subsurface material, conducting three percolation tests at a depth targeting the most permeable layer, performing laboratory testing on the selected soils samples, reviewing the field data and the laboratory test results, performing engineering analyses, and preparing a final geotechnical evaluation report that included results of our field and laboratory testing and determined infiltration rates at the site. Our team completed the project in less than two weeks.