UMass Lowell North Quad Infrastructure Upgrade

Project Information

Project Location:
Lowell, MA
Status:
Completed
Structure Type:
School / College / University

References

Owner:
University of Massachusetts Lowell

Scope Of Work

SITUATION:

UMass Lowell’s  Quad, a centerpiece of the  Campus, has undergone a significant transformation. Composed of the interconnected Southwick, Kitson, Falmouth & Pasteur Halls, the University has revitalized these historic buildings for use as state-of-the-art office, classroom, and computational laboratory space. The new Quad required a sound infrastructure to support these changes. BOND was engaged to provide preconstruction and construction services for the first phase of this project.

As part of this significant facility reinvestment, BOND constructed two additions – or pods – that will provide improved access, additional toilet facilities, and expanded infrastructure pathways for the quad buildings. The team also upgraded fire sprinkler systems, installed a new electrical service, installed a 200kV diesel emergency generator, and completed general upgrades to ensure compliance with modern building codes. The Quad’s existing paved area is now an outdoor campus green space.

CHALLENGES:

Work performed in and around an occupied academic building

Project performed in accordance with a public Chapter 149A delivery method

Provide a seamless connection between existing building and “pod” additions

Work around existing underground utilities in close proximity to the campus’  Utility Plant

Immovable project completion date reliant upon academic calendar

SOLUTIONS:

Utilization of in-house BIM and laser scanning services to minimize clashing during the installation of new plumbing/fire protection loops

Laser scanning of existing buildings’ exterior to facilitate a smooth connection between the pods and existing structure

Development of a Revit model to lay the groundwork for a smooth MEP coordination process, including the modeling of below-ground utility lines

Completion of an extensive enabling effort to demolish an underground bunker, reroute utilities, and make way for the new additions

Procurement of early packages, including sitework, steel, and enabling

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1165797/bond-brothers/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.