Logo

Midland Erosion LLC

Hibbing, MN 55746

Company Info

  • Size 10-19 Employees
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

RLP Services LLC is Minnesota’s industry leading company in SWPPP compliance, erosion and sediment control. Whether your a builder, developer, general contractor or a government agency we provide a wide variety of services to fit your needs all in one place. RLP Services LLC is certified by the state of Minnesota (MNDOT) and CPESC certified in erosion and sediment control for site management and installation for all commercial and state projects state wide.

With locations in the Minneapolis metro area and in Hibbing Minnesota we can better serve a wider area with all services better than the competition, while keeping prices at a minimum. RLP Services LLC is most recommended for quality workmanship, continuing education, and consistently great customer service for we remain the forefront in quality for your specific project and would be honored to handle any of your project needs.

*RLP Services LLC cares about the customers wants and needs and are willing to go the extra mile to ensure a good quality product outcome in any job situation.

*All quotes and invoices for any job is easy for everyone to understand. *Warranty backed services with top recommended products.

*State of Minnesota, MNDOT, CPESC, Versa-Lok walls and Willow Creek pavers Certifications and Insured.

*Low everyday prices.

*State wide erosion control.

What We Do

Commercial Experience

Civil & Site Development Misc Project
Airport Runway Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Casinos Church / Synagogue City / Town Hall Club House / Community Center Court House Dams & Levies Design Build Education (K-12) Fire / Police Station Fitness Center Gas Station Golf Course Grocery Stores Hospital / Nursing Home Hotel / Motel House Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Mixed Use Museum Office Building Park / Playground Parking Garage Parking Lots Post Office Radio / Television Station Residential Building Restaurant Retail Store Road / Highway School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Tunnel Utilities

Regions & Counties Serviced

  • Minnesota - Minneapolis / St. Paul

Minnesota All

Our CSI Codes

01 57 13 - Temporary Erosion and Sediment Control
01 57 23 - Temporary Storm Water Pollution Control
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 58 13 - Snow Fencing
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
31 72 13 - Rock Reinforcement and Initial Support
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 11 33 - Cement-Treated Base Courses
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 32 34 - Reinforced Soil Retaining Walls
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.19 - Planting Soil Mixing
32 91 13.23 - Structural Soil Mixing
32 91 13.26 - Planting Beds
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
32 92 13 - Hydro-Mulching
32 92 16 - Plugging
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 06 40.13 - Storm Drainage Schedule
33 44 19 - Utility Storm Water Treatment
33 44 19.13 - In-Line Utility Storm Water Filters
33 44 19.16 - Catch Basin Insert Utility Storm Water Filters
33 44 19.19 - Utility Oil and Gas Separators
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
34 82 19 - Bridge Pier Protection
35 31 29.40 - Stone Groins
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 42 35 - Slope Protection Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
35 43 35 - Slope Protection Scour Protection

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Service Work/Repairs
  • Projects Up to $5,000,000

Gallery

Featured Image 1
Erosion Control
Featured Image 2
Shoreline Restoration
Featured Image 3
Landscaping-Sod
Featured Image 4
Hydro-Seeding

Associations & Memberships

The Blue Book Network
The Blue Book Network
MECA (Minnesota Erosion Control Assn.)
MECA (Minnesota Erosion Control Assn.)
CPESC (Certified Professional In Erosion & Sediment Control)
CPESC (Certified Professional In Erosion & Sediment Control)
Share URL copied!
https://www.thebluebook.com/iProView/1142756/midland-erosion-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.