Logo

Carey's Heating & Air Conditioning, Inc.

Tinley Park, IL 60487

Company Info

  • Est. 1992
  • Size 50-99 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Carey's Heating and Air Conditioning has provided quality maintenance, repair and replacement of HVAC systems for commercial buildings since 1992.  Our mission is to provide your properties with the finest climate controlled indoor environment - to make it the best possible place to work or shop.  We accomplish our mission with the industry's most highly trained staff, superior project management, and a strong commitment to customer service.

Carey's highly trained technicians understand your equipment and systems and know what it takes to keep them running strong.  Our professionals have the know-how that it takes to do successful repairs the first time...avoiding multiple service calls.

A Carey's HVAC replacement can reduce your energy and operating costs and enhance comfort and convenience throughout your buildings.  Let Carey's staff your project with a team of professionals that includes qualified project mangers, designers, installation experts, and programmers.

With our full sheet metal shop, Carey's can design and build systems to fit any situations.  Our Project Managers and Engineers are trained and experienced in design and construction of HVAC systems for any purpose including:

  • Monitoring and maintaining indoor air quality
  • Integrating entire malls or campuses
  • Maintaining close pressure differentials for clean rooms and other critical spaces

 

 

What We Do

Regions & Counties Serviced

  • Chicago, N.W. Indiana

Illinois 9

  • Cook
  • Dupage
  • Grundy
  • Kane
  • Kankakee
  • Kendall
  • Lake
  • Mchenry
  • Will

Indiana 2

  • Lake
  • Porter

Wisconsin 1

  • Kenosha

Our CSI Codes

23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 50 - Operation and Maintenance of Central Heating Equipment
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 05 13 - Common Motor Requirements for HVAC Equipment
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 50 - Schedules for Central Heating Equipment
23 06 50.13 - Heating Boiler Schedule
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 20 00.00.01 - HVAC Piping and Pumps
23 30 00.00.01 - HVAC Air Distribution
23 31 16.13 - Fibrous-Glass Ducts
23 31 16.16 - Thermoset Fiberglass-Reinforced Plastic Ducts
23 36 13 - Constant-Air-Volume Units
23 36 16 - Variable-Air-Volume Units
23 57 19 - Liquid-to-Liquid Heat Exchangers
23 57 19.13 - Plate-Type, Liquid-to-Liquid Heat Exchangers
23 57 19.16 - Shell-Type, Liquid-to-Liquid Heat Exchangers
23 64 26 - Rotary-Screw Water Chillers
23 70 00.00.01 - Central HVAC Equipment
23 72 13 - Heat-Wheel Air-to-Air Energy-Recovery Equipment
23 72 16 - Heat-Pipe Air-to-Air Energy-Recovery Equipment
23 72 19 - Fixed-Plate Air-to-Air Energy-Recovery Equipment
23 72 23 - Packaged Air-to-Air Energy-Recovery Units
23 73 13 - Modular Indoor Central-Station Air-Handling Units
23 73 23 - Custom Indoor Central-Station Air-Handling Units
23 74 13 - Packaged, Outdoor, Central-Station Air-Handling Units
23 74 23.13 - Packaged, Direct-Fired, Outdoor, Heating-Only Makeup-Air Units
23 74 23.16 - Packaged, Indirect-Fired, Outdoor, Heating-Only Makeup-Air Units
23 74 33 - Packaged, Outdoor, Heating and Cooling Makeup Air-Conditioners
23 75 13 - Custom-Packaged, Outdoor, Central-Station Air-Handling Units
23 75 23 - Custom-Packaged, Outdoor, Heating and Ventilating Makeup-Air Units
23 75 33 - Custom-Packaged, Outdoor, Heating and Cooling Makeup Air-Conditioners
23 80 00.00.01 - Decentralized HVAC Equipment
23 81 13 - Packaged Terminal Air-Conditioners
23 81 16 - Room Air-Conditioners
23 81 19 - Self-Contained Air-Conditioners
23 81 19.13 - Small-Capacity Self-Contained Air-Conditioners
23 81 19.16 - Large-Capacity Self-Contained Air-Conditioners
23 81 23 - Computer-Room Air-Conditioners
23 81 26 - Split-System Air-Conditioners
23 82 13 - Valance Heating and Cooling Units
23 82 16 - Air Coils
23 82 19 - Fan Coil Units

Project Experience

  • Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Service Work/Repairs

Gallery

Featured Image 1
Services
Featured Image 2
RTU Installation Project
Featured Image 3
RTU Installation Project
Featured Image 4
Freeway Ford RTU Installation

Associations & Memberships

Chamber of Commerce
Chamber of Commerce
Pipefitters Local 597
Pipefitters Local 597
Sheet Metal Workers Local 265
Sheet Metal Workers Local 265
EPA (Environmental Protection Agency)
EPA (Environmental Protection Agency)
ComEd Trade Ally
ComEd Trade Ally
NIOSH (Nat. Inst. for Occupational Safety & Health)
NIOSH (Nat. Inst. for Occupational Safety & Health)
OSHA (Occupational Safety & Health Administration)
OSHA (Occupational Safety & Health Administration)

Preferred Brands

Carrier
Carrier
Carrier Heating & Air Conditioning
Carrier Heating & Air Conditioning
Lennox
Lennox
York
York
Trane
Trane
Rheem
Rheem
Honeywell
Honeywell
Share URL copied!
https://www.thebluebook.com/iProView/1122659/carey-s-heating-air-conditioning-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.