Logo

Paxton Contractors Corp.

Suffolk, VA 23432

Company Info

  • Est. 1992
  • Annual Vol Undisclosed
  • DUNS # 027301634

People Also View These
Loading...

Our Story

Paxton Contractors Corporation was started in 1990 by Jeff Paxton.  He had been in the busy for years and decided he wanted to start out on his own.  Paxton Contractors Corp has a strong foundation with a host of experience.  Paxton is committed to customer service based on strong family values.  Countless projects has helped Paxton build a successful and experienced team of employees and a large fleet of heavy equipment, dump trucks and vehicles.  A steady growth and success allows Paxton to bond projects in the excess of 10 Million.  Paxton has a record for safety, with no accidents in the last 20 years. 

We specialize in clearing, grading, and utility work.  We also have two sand pits that provide businesses and homeowners with a variety of material.  We proudly serve the following cities: Chesapeake, Hampton, Newport News, Norfolk, Portsmouth, Suffolk, Virginia Beach and Isle of Wight County. 

What We Do

Commercial Experience

Misc Project
Airport Runway Civil & Site Development Non-Building Construction Parking Lots Road / Highway Utilities

Regions & Counties Serviced

  • Virginia

Virginia 8

  • Chesapeake (City Of)
  • Hampton (City Of)
  • Isle Of Wight
  • Newport News (City Of)
  • Norfolk City
  • Portsmouth (City Of)
  • Suffolk (City Of)
  • Virginia Beach City

Our CSI Codes

01 18 00.00.01 - Project Utility Sources
01 31 13 - Project Coordination
01 31 16 - Multiple Contract Coordination
01 31 19 - Project Meetings
01 31 19.13 - Preconstruction Meetings
01 31 19.16 - Site Mobilization Meetings
01 31 19.23 - Progress Meetings
01 31 19.33 - Preinstallation Meetings
01 31 23 - Project Web Site
01 53 19 - Temporary Overpasses
01 53 23 - Temporary Ramps
01 53 26 - Temporary Runarounds
01 56 13 - Temporary Air Barriers
01 56 16 - Temporary Dust Barriers
01 56 19 - Temporary Noise Barriers
01 56 23 - Temporary Barricades
01 56 26 - Temporary Fencing
01 56 29 - Temporary Protective Walkways
01 56 33 - Temporary Security Barriers
01 56 36 - Temporary Security Enclosures
01 56 39 - Temporary Tree and Plant Protection
01 57 13 - Temporary Erosion and Sediment Control
01 57 16 - Temporary Pest Control
01 57 19 - Temporary Environmental Controls
01 57 23 - Temporary Storm Water Pollution Control
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 01 50 - Maintenance of Site Remediation
02 01 65 - Maintenance of Underground Storage Tank Removal
02 01 80 - Maintenance of Facility Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 20 00.00.01 - Assessment
02 21 13 - Site Surveys
02 21 13.13 - Boundary and Survey Markers
02 21 16 - Measured Drawings
02 22 13 - Movement and Vibration Assessment
02 22 16 - Acoustic Assessment
02 22 19 - Traffic Assessment
02 22 23 - Accessibility Assessment
02 24 13 - Natural Environment Assessment
02 24 13.13 - Air Assessment
02 24 13.43 - Water Assessment
02 24 13.73 - Land Assessment
02 24 23 - Chemical Sampling and Analysis of Soils
02 24 43 - Transboundary and Global Environmental Aspects Assessment
02 25 16 - Existing Concrete Assessment
02 25 16.13 - Concrete Assessment Drilling
02 25 19 - Existing Masonry Assessment
02 25 19.13 - Masonry Assessment Drilling
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 25 29 - Existing Thermal and Moisture Protection Assessment
02 25 29.13 - Waterproofing Investigations
02 25 29.23 - Roofing Investigations
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.13 - Paving Removal
02 41 13.23 - Utility Line Removal
02 41 13.33 - Railtrack Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 58 13 - Snow Fencing
02 58 16 - Snow Avalanche Control
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 35 13 - High-Tolerance Concrete Floor Finishing
03 35 16 - Heavy-Duty Concrete Floor Finishing
03 35 19 - Colored Concrete Finishing
03 35 23 - Exposed Aggregate Concrete Finishing
03 35 26 - Grooved Concrete Surface Finishing
03 35 29 - Tooled Concrete Finishing
03 35 33 - Stamped Concrete Finishing
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 40 - Maintenance of Shoring and Underpinning
31 01 50 - Maintenance of Excavation Support and Protection
31 05 13 - Soils for Earthwork
31 05 16 - Aggregates for Earthwork
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 05 23 - Cement and Concrete for Earthwork
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 06 20.16 - Backfill Material Schedule
31 06 40 - Schedules for Shoring and Underpinning
31 06 50 - Schedules for Excavation Support and Protection
31 06 60 - Schedules for Special Foundations and Load Bearing Elements
31 06 70 - Schedules for Tunneling and Mining
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 13.13 - Groundwater Monitoring During Construction
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 13 13 - Selective Tree and Shrub Removal
31 13 16 - Selective Tree and Shrub Trimming
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 16.13 - Roadway Subgrade Reshaping
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 19 - Dewatering
31 23 23 - Fill
31 23 23.13 - Backfill
31 23 23.23 - Compaction
31 23 23.33 - Flowable Fill
31 23 23.43 - Geofoam
31 23 33 - Trenching and Backfilling
31 24 13 - Roadway Embankments
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 30 00.00.01 - Earthwork Methods
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 32 33 - Shotcrete Soil Slope Stabilization
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 23.16 - Precast Concrete Slope Paving
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 36 13 - Gabion Boxes
31 36 19 - Gabion Mattresses
31 36 19.13 - Vegetated Gabion Mattresses
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.13 - Rubble-Stone Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
31 40 00.00.01 - Shoring and Underpinning
31 41 13 - Timber Shoring
31 41 16 - Sheet Piling
31 41 16.13 - Steel Sheet Piling
31 41 16.16 - Plastic Sheet Piling
31 41 19 - Metal Hydraulic Shoring
31 41 19.13 - Aluminum Hydraulic Shoring
31 41 23 - Pneumatic Shoring
31 41 33 - Trench Shielding
31 50 00.00.01 - Excavation Support and Protection
31 51 13 - Excavation Soil Anchors
31 56 13 - Bentonite Slurry Walls
31 56 13.13 - Soil-Bentonite Slurry Walls
31 56 13.16 - Cement-Bentonite Slurry Walls
31 56 13.19 - Slag-Cement-Bentonite Slurry Walls
31 56 13.23 - Soil-Cement-Bentonite Slurry Walls
31 56 13.26 - Pozzolan-Bentonite Slurry Walls
31 56 13.29 - Organically-Modified Bentonite Slurry Walls
31 56 16 - Attipulgite Slurry Walls
31 56 16.13 - Soil-Attipulgite Slurry Walls
31 56 19 - Slurry-Geomembrane Composite Slurry Walls
31 56 23 - Lean Concrete Slurry Walls
31 56 26 - Bio-Polymer Trench Drain
31 60 00.00.01 - Special Foundations and Load-Bearing Elements
31 66 13 - Special Piles
31 66 16 - Special Foundation Walls
31 66 16.13 - Anchored Foundation Walls
31 66 16.23 - Concrete Cribbing Foundation Walls
31 66 16.26 - Metal Cribbing Foundation Walls
31 66 16.33 - Manufactured Modular Foundation Walls
31 66 16.43 - Mechanically Stabilized Earth Foundation Walls
31 66 16.46 - Slurry Diaphragm Foundation Walls
31 66 16.53 - Soldier-Beam Foundation Walls
31 68 13 - Rock Foundation Anchors
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 10 00.00.01 - Water Utilities
33 11 13 - Public Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 11 19 - Fire Suppression Utility Water Distribution Piping
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 31 16 - Industrial Waste Utility Sewerage Piping
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 39 13 - Sanitary Utility Sewerage Manholes, Frames, and Covers
33 39 23 - Sanitary Utility Sewerage Cleanouts
33 40 00.00.01 - Storm Drainage Utilities
33 41 13 - Public Storm Utility Drainage Piping
33 42 13 - Pipe Culverts
33 42 13.13 - Public Pipe Culverts
33 42 16 - Concrete Culverts
33 42 16.13 - Precast Concrete Culverts
33 42 16.16 - Cast-in-Place Concrete Culverts
33 44 13 - Utility Area Drains
33 44 13.13 - Catchbasins
33 44 16 - Utility Trench Drains
33 44 19 - Utility Storm Water Treatment
33 44 19.13 - In-Line Utility Storm Water Filters
33 44 19.16 - Catch Basin Insert Utility Storm Water Filters
33 44 19.19 - Utility Oil and Gas Separators
33 47 13 - Pond and Reservoir Liners
33 47 13.13 - Pond Liners
33 47 13.53 - Reservoir Liners
33 47 16 - Pond and Reservoir Covers
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19 - Water Ponds and Reservoirs
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Projects From $100,000 to $500,000

Gallery

Featured Image 1
Tractor Supply
Featured Image 2
Dollar General - Holland
Featured Image 3
Peets Coffee - Suffolk
Featured Image 4
Ace Expansion - Suffolk

Associations & Memberships

TBA (Tidewater Builders Assn.)
TBA (Tidewater Builders Assn.)
Share URL copied!
https://www.thebluebook.com/iProView/1002583/paxton-contractors-corp/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.